A&E Construction EV Infrastructure

Turnkey EV charging infrastructure construction for DC, Maryland and Virginia

A&E Construction EV Infrastructure delivers manufacturer-neutral, turnkey construction for Level 2, DC fast charging, fleet and high-power EV charging sites—from site assessment and permitting through civil work, electrical make-ready, installation coordination, commissioning support and future expansion.

Serving commercial properties, fleets, multifamily, parking, hospitality, retail, dealerships, fuel and convenience locations, developers and property managers across the DMV.

Why owners choose A&E Construction EV Infrastructure

Turnkey construction delivery

One construction team coordinates civil, electrical, site, permitting and field execution requirements around the selected EV charging system.

Manufacturer-neutral

A&E can coordinate construction around the charger, network and utility solution selected by the owner rather than locking the project to one equipment brand.

Built for expansion

Infrastructure can be planned with future charging capacity, conduit pathways, electrical distribution and phased growth in mind.

EV charging construction capabilities

Turnkey construction support from site planning through energization, commissioning support and ongoing expansion.

Site assessment & preconstruction

Existing-condition review, site logistics, charger layout coordination, constructability, budgeting and phasing.

Design, permits & utility coordination

Architectural and engineering coordination, permitting support, utility interface and power-capacity planning.

Civil & site work

Excavation, trenching, duct bank, conduit, concrete pads, equipment foundations, bollards, paving, striping, signage, ADA work and restoration.

Electrical make-ready

Feeders, panels, switchgear, transformer coordination, distribution, disconnects, grounding and site electrical infrastructure.

Level 2 & DC fast charging

Construction support for Level 2, DCFC, fleet and higher-power charging installations, including wall or pedestal applications where appropriate.

Commissioning, network & maintenance

Testing and commissioning support, network activation coordination, closeout, maintenance planning and future charger expansion.

Project inquiry

Tell us about your EV charging project

Share the property or fleet location, number of charging ports, charger type if known, electrical service information, project schedule and any utility or design documents available.

How an EV infrastructure project moves forward

Step 1

Assess the site

Review parking layout, electrical service, charger goals, utility constraints, civil conditions and future expansion needs.

Step 2

Coordinate design and construction

Align engineering, permitting, utility requirements, civil work, electrical make-ready, equipment foundations and installation sequencing.

Step 3

Commission and expand

Support testing, commissioning, network activation, closeout, maintenance planning and future charging expansion.

EV charging infrastructure questions

What EV charging infrastructure services does A&E Construction provide?

A&E Construction EV Infrastructure provides turnkey EV charging construction including site assessment, design and engineering coordination, permitting, utility coordination, civil work, electrical make-ready, charger foundations, EVSE installation coordination, testing, commissioning support and expansion planning.

What types of EV chargers can A&E Construction support?

A&E supports Level 2 charging, DC fast charging, fleet charging and higher-power charging projects. Level 2 designs can include 208/240V single-phase configurations and common commercial charging architectures, with final equipment selection based on the owner, utility and project requirements.

What types of properties can add EV charging?

A&E can support multifamily properties, offices, hotels, retail sites, parking facilities, dealerships, rental-car and commercial fleets, fuel and convenience locations, developers, property managers and other commercial sites.

Does A&E Construction work with a specific charger manufacturer?

A&E Construction EV Infrastructure is manufacturer-neutral. The construction scope can be coordinated around the charger, network and utility requirements selected for the project.

Planning an EV charging site?

Send the site information or call (202) 746-0659 to discuss turnkey EV charging construction, fleet charging, Level 2, DC fast charging or phased infrastructure expansion.

A & E Construction LLC

Manufacturer-neutral turnkey EV charging infrastructure construction: preconstruction, design coordination, permitting, utility coordination, civil/site work, electrical make-ready, Level 2 and DC fast charging, commissioning support, maintenance and expansion.